BAM
Balcón al Mar, Jávea, 2024-2025
A full renovation, inside and out: the living area moves from the upper floor to the ground floor, with a large opening and a new kitchen. The garden and entrance have been completely redesigned.
See the result as a slideshowBefore and after
The pergola
The pool
The garden
The entrance
The ground floor
The kitchen
A bedroom
The round room upstairs, now two bathrooms
The work, month by month
From the first demolition, in May 2024, to the lawn laid in February 2025.
-
May 2024
The pool is rebuilt. -
May 2024
The interior is demolished. -
June 2024
Props support the structure to create the large opening. -
July 2024
The niches are built on site. -
September 2024
Upstairs, the round room is stripped back. -
November 2024
The rounded fireplace takes shape under the beams. -
December 2024
An old carved door becomes a headboard. -
December 2024
The entrance and garden are completely rebuilt. -
February 2025
The lawn is laid.
The result
A project like this one?
We speak French, English and Spanish.
+34 665 982 653 contacto@clemala.com
Clemala Invest






















