Cansalades
Jávea, 2022-2024
A full renovation, inside and out: from 6 bedrooms and 2 kitchens to 5 bedrooms and a games room, with an enlarged outdoor terrace.
See the result as a slideshowBefore and after
The covered terrace
The pool
The staircase
The living room
The kitchen
The bedroom
The bathroom
The work, step by step
A renovation is also judged by what can no longer be seen once it is finished.
-
July 2022
Demolition begins outside. -
August 2022
A new pergola beside the pool. -
January 2023
A bathroom is completely stripped out. -
February 2023
The walls are stripped back. -
March 2023
The staircase is opened up in the floor. -
March 2023
The outdoor terrace is enlarged. -
May 2023
The bathroom unit receives its basins.