Fucsia
Jávea, 2026, in progress
A complete renovation, inside and out, begun in January 2026 and still under way: the house opens up, and the staircase and pool are rebuilt.
See the house before the workBefore and after
The kitchen
The living area
The fireplace
The work, month by month
From the first pictures, in December 2025, to the work today.
-
December 2025
The house before the work. -
December 2025
An original bathroom, with orange tiles. -
December 2025
The old staircase and its tiled steps. -
January 2026
The old fireplace is taken out. -
January 2026
Props are set up around the stone arch. -
February 2026
A steel beam goes in to open up the space. -
February 2026
The new staircase is built in brick. -
February 2026
A large opening is made towards the garden. -
March 2026
The underfloor heating is laid. -
May 2026
The curved staircase is plastered. -
June 2026
The pool gets its rounded steps and mosaic. -
June 2026
The arches and niches are built on site. -
June 2026
The bathroom unit receives its basins. -
October 2026
The team fits the large wooden gate. -
November 2026
The wooden pergola gets its roof.