Clemala Invest

Fucsia

Jávea, 2026, in progress

A complete renovation, inside and out, begun in January 2026 and still under way: the house opens up, and the staircase and pool are rebuilt.

See the house before the work
Two thatched parasols beside the turquoise pool

Before and after

The pool

The original pool seen from the terrace, surrounded by red tiles
Before
The rebuilt pool, its rounded steps and pale stone edge
After

The kitchen

The old kitchen, its dark wood units and patterned floor
Before
The new kitchen, its wooden units, white island and glass doors
After

The living area

The original dining room, its wooden table and the stone arch to the lounge
Before
The renovated living area, wide open, with its round table and pale floor
After

The fireplace

The old stone fireplace and its mirror, under dark beams
Before
The new fireplace set into a white wall, beneath a wooden disc
After

The work, month by month

From the first pictures, in December 2025, to the work today.

  1. The house before the work.

    December 2025
    The house before the work.

  2. An original bathroom, with orange tiles.

    December 2025
    An original bathroom, with orange tiles.

  3. The old staircase and its tiled steps.

    December 2025
    The old staircase and its tiled steps.

  4. The old fireplace is taken out.

    January 2026
    The old fireplace is taken out.

  5. Props are set up around the stone arch.

    January 2026
    Props are set up around the stone arch.

  6. A steel beam goes in to open up the space.

    February 2026
    A steel beam goes in to open up the space.

  7. The new staircase is built in brick.

    February 2026
    The new staircase is built in brick.

  8. A large opening is made towards the garden.

    February 2026
    A large opening is made towards the garden.

  9. The underfloor heating is laid.

    March 2026
    The underfloor heating is laid.

  10. The curved staircase is plastered.

    May 2026
    The curved staircase is plastered.

  11. The pool gets its rounded steps and mosaic.

    June 2026
    The pool gets its rounded steps and mosaic.

  12. The arches and niches are built on site.

    June 2026
    The arches and niches are built on site.

  13. The bathroom unit receives its basins.

    June 2026
    The bathroom unit receives its basins.

  14. The team fits the large wooden gate.

    October 2026
    The team fits the large wooden gate.

  15. The wooden pergola gets its roof.

    November 2026
    The wooden pergola gets its roof.

What is already taking shape

The covered terrace and its seating area, facing the view
The covered terrace and its seating area, facing the view
A bedroom and its stone wall
A bedroom and its stone wall
A built-in headboard, beneath its arch
A built-in headboard, beneath its arch
A curved pine door
A curved pine door
A large table beneath the timber roof
A large table beneath the timber roof
A bedroom and its arched niche
A bedroom and its arched niche
A bathroom and its basins
A bathroom and its basins