Granadella
Cap Martí, Jávea, 2020-2021
A full renovation, inside and out, and a basement created under the house, with two bedrooms and a bathroom.
Before and after
The fireplace wall
The living room
The bedroom
The garden
A basement that did not exist
Under the house there was only a crawl space. Here is how it became two bedrooms and a bathroom.
-
April 2018
The space under the house: earth and cables. -
September 2020
Excavation begins. -
October 2020
The ground is prepared for the slab. -
November 2020
The staircase takes shape. -
December 2020
The stairwell and glass partition open onto the ground floor. -
December 2020
The bathroom unit is built on site.
The result
A project like this one?
We speak French, English and Spanish.
+34 665 982 653 contacto@clemala.com
Clemala Invest















